Welder Test Checklist

Welder Test  Checklist 
What Job welding Inspector before, during and after Welder Test ?
Below some checklist which can help you before Welder Qualification Test start :

Welder Test  Checklist
No
Item Description
Check, Review, Verify
Yes
No

Before Welder Test Start


1
Proposed WQT ready on test location and complete with Attribute and Identification number welder(ID) ?

2
Welding Machine Calibration Record ?

3
Polarity as per approved WPS ?

4
Tang Ampere, Volt Meter, Temperature Gauge, Welding Gauge available on test location ?

5
Material test Mill Certificate, Electrode available and accordance with approved WPS ?

6
Positions of weld as per approved WPS or not ?

7
Check 1G,2G,3G,4G,5G,6G or…..?

8
Joint Design accordance with approved WPS ?

9
Check Angle, Root face, Root Gap, Thickness ?

10
Make Identification for test material(specimen) ?

11
Attended by all Party(clients,fabricator,3rd party, Government representative) ?






During Welder Test Start


1
Record Start time of test ?

2
Record Ampere, Voltage, Temperature ?

3
Inspect Root penetration as per code/standard or not ?

4
Attend, inspect, review during test and record all non conformance out of proposed WQT ?

5
Sign result and data of proposed WPS ?






After Welder Test Start


1
Review NDT result ?

2
Attending during Destructive Test ?

3
Review and Approve WQT as per Code/Standard ?

4
Copy and Keep(documentation/File) Approved WQT with WQT Registered

by online welding courses – non destructive testing

Comments

2 Responses to "Welder Test Checklist"
  1. We carry out the qualification of Brazing operator qualification test in UAE to achieve their goals in meeting industry standards. Welder test in UAE

  2. We carry out the qualification of Brazing operator qualification test in UAE to achieve their goals in meeting industry standards.Welder test in UAE

Speak Your Mind