PQR / WPS Test Checklist

PQR / WPS Test Checklist 
What Job welding Inspector before, during and after PQR / WPS Test(procedure qualification test) ?
Below some checklist which can help you before PQR / WPS Test(procedure qualification test) start :
PQR / WPS Test Checklist
No
Item Description
Check, Review, Verify
Yes
No

Before Procedure Qualification Test Start


1
Proposed WPS ready on test location or not ?

2
Welding Machine Calibration Record ?

3
Polarity as per proposed WPS ?

4
Tang Ampere, Volt Meter, Temperature Gauge, Welding Gauge available on test location ?

5
Material test Mill Certificate, Electrode available and accordance with proposed WPS ?

6
Positions of weld as per proposed WPS or not ?

7
Check 1G,2G,3G,4G,5G,6G or…..?

8
Joint Design accordance with proposed WPS ?

9
Check Angle, Root face, Root Gap, Thickness ?

10
Make Identification for test material(specimen) ?

11
Attended by all Party(clients,fabricator,3rd party, Government representative) ?






During Procedure Qualification Test Start


1
Record Start time of test ?

2
Record Ampere, Voltage, Temperature ?

3
Inspect Root penetration as per code/standard or not ?

4
Attend, inspect, review during test and record all non conformance out of proposed WPS ?

5
Sign result and data of proposed WPS ?






After Procedure Qualification Test Start


1
Review NDT result ?

2
Attending during Destructive Test ?

3
Review and Approve WPS as per Code/Standard ?

4
Copy and Keep(documentation/File) Approved WPS with WPS Registered